We are expecting a paving contractor to be on site either Wednesday or Thursday of this week to make repairs in the following parking lots.  I cannot confirm which day they will be here at this time.

University Finance Office--areas to be repaired are outlined on the pavement in orange.  They are in the entry aisle and in the aisle along the south side of the lot.  Please do not park in these areas; and use the entrance off Benton which leads to the driveway at the back of your building to avoid any conflicts;

Leavey Lot:  the areas to be repaired are primarily at the north end of the lot.  It is recommended that cars enter the lot from Accolti way while repairs are in progress;

South Bannan Lot:  The area around an underground vault at the west end of the first row of parking spaces (closest to Bannan Hall) needs to be repaired.  When the work is in progress, cars will not be able to exit the lot, so this row of stalls will be closed to vehicles on Wednesday (and Thursday) if necessary.  Signs/Barricades will be in place at Sherman St blocking access to these stalls temporarily.

Each of these lots will be closed to all vehicles during pavement resealing and re-striping in the near future.  We will notify you well in advance of when this work will occur.